Storm water pipe blockage to existing property drainage in Clifton Springs.
The pipe was excavated, exposed & repaired.
The system was then given a final flush to ensure the storm water drain had optimal flow.
The existing water meter on this project in Newtown needed to be re-located to suit new landscaping works.
The existing authority connection was frozen & once the ice plug formed works to the existing meter could begin.
The meter was commissioned & associated parts were replaced with a new isolation valve, back-flow prevention & barrel unions to suit new pipework & water authority requirements.
The Geelong Enviro Plumbing website launched in May 2017.
We hope to keep you updated with our work in the Geelong and surrounding areas including news and tips about sustainable plumbing.
Come back and visit once in a while to see what’s new.